Advanced Search

Show simple item record

dc.contributor.authorŞenel, Mine
dc.contributor.authorŞenel, Bilgin
dc.contributor.authorAkan, Yaprak
dc.date.accessioned2018-05-31T11:42:55Z
dc.date.available2018-05-31T11:42:55Z
dc.date.issued2017-08
dc.identifier.citationŞenel, M., Şenel, B. ve Akan, Y. (2017). Simülayon Methodu ile Değişim Mühendisliği. Yönetim Bilimleri Dergisi, 30, 275-295.en_US
dc.identifier.issn1304-5318
dc.identifier.urihttps://hdl.handle.net/20.500.12428/1822
dc.description.abstractBu çalışmanın amacı, Türk Ağır Sanayinin lokomotifi olarak hizmet veren Türkiye Lokomotif Sanayi A.Ş. (TÜLOMSAŞ) vagon fabrikasının 14 adet tezgah ve 30 personeli ile boji atölyesinin iş süreçlerinin değişim mühendisliği yöntemlerinden Hammer Champy modeline uygun benzetim modelleri kurularak süreçleri yenilemek, süreçler yenilenirken teknolojiden daha fazla yararlanmak ve bugünden çok daha kaliteli ürünler üretmektir. Bunun için çalışmada en iyi sürecin oluşturulmasında iş süreçleri tasarlanırken fabrikanın kısıtları ve ya uygulanabilirliği olan fakat işletmeye getirisi belirsiz olan tüm iş süreçleri düşünülerek 6 senaryo geliştirilmiş ve bu senaryolara uygun bilgisayar tabanlı ARENA 9.0 Benzetim (Simulasyon) programı kullanılarak modeller oluşturulmuştur. Toplam 12 ay süren değişim Mühendisliği uygulamaları sonucunda, uygulanabilirliği en yüksek, ula- şılmak istenen hedeflere en yakın sonucu veren senaryo seçilerek, tesisin değişim mühendisliği uygulamalarından önce yıllık boji miktarı 2029 adet iken seçilen senaryo ile yıllık boji miktarı 2164 adette çıkarılmıştır. Bu çalışma ile demiryolu sektöründe değişim mühendisliği uygulamaları ile gerçekleştirilecek olan değişimin tüm belirsizlik durumlarını kurulan benzetim modelleri ile yok edip iş süreçlerinin ayrıntılı bir şekilde incelenmesine imkan sağlayacaktır.en_US
dc.description.abstractThe aim of this study is to establish the Turkish Lokomotif Sanayi A.Ş., which serves as the locomotive of the Turkish Heavy Industry. (TÜLOMSAŞ) 14 bench, 30 personnel and bogie workshop business process change engineering methods by using simulation models suitable for Hammer Champy model, to renew the processes, to utilize the technology more while renewing the processes and to produce much better quality products. To do this, six scenarios were developed by considering the constraints of the factory and all the business processes which were either feasible, but whose operation was uncertain, and models were created by using the computerized ARENA 9.0 Simulation program in this scenario. As a result of total 12 months of change engineering engineering applications, the scenario giving the closest result to the most applicable targets was selected and the annual bogie amount was increased to 2164 with the scenario selected while the annual bogie amount was 2029 before the change engineering application. With this study, the change that will be realized with the change engineer applications in the railway sector will be able to eliminate all the uncertainty states with the established simulation models and to examine the business processes in detail.en_US
dc.language.isoturen_US
dc.publisherÇanakkale Onsekiz Mart Üniversitesien_US
dc.rights.uriinfo:eu-repo/semantics/openAccessen_US
dc.subjectDeğişim Mühendisliğien_US
dc.subjectKamu sektörüen_US
dc.subjectBenzetim Modelien_US
dc.subjectHammer Champy Modelien_US
dc.subjectİş Akışıen_US
dc.subjectChange Engineeringen_US
dc.subjectPublic Sectoren_US
dc.subjectSimulation Modelsen_US
dc.subjectHammer Champy Modelsen_US
dc.subjectWorkflowen_US
dc.titleSimülayon Methodu ile Değişim Mühendisliğien_US
dc.title.alternativeBusiness Process Reengineering with Simulation Methoden_US
dc.typearticleen_US
dc.authorid16759en_US
dc.authorid147940en_US
dc.relation.ispartofYönetim Bilimleri Dergisien_US
dc.department[Belirlenecek]en_US
dc.institutionauthor. . .en_US
dc.relation.publicationcategory. . .en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record